Atlas undertook the civil works and traffic management for the installation of 850m of 33kV power cables along Buchannans Rd. This project was entirely in the road corridor and involved some major intersection crossings. The traffic team did a great job managing the challenge of maintaining access to residents as the full 850m trench had to be open. The cable was installed from a single 800m drum.