This was a high profile site coming out of Queenstown towards Kelvin Heights and involved hill side works and Rock Drilling. The main aim of the project is to install a new power cable in an approved easement. This easement rose up a steep hill and required anchoring and slinging of excavators on the steep slope and drilling 200mm holes in the rock face before turning a bend and running along the top of a ridge. The works required great care as Frankton’s main high pressure Water Mains ran through this easement thus requiring a week of Hydro Excavation and survey/setting out work before we could place an excavator in the area. The project has run smoothly after months of planning and customer liasion.